PUTTING THE PLANET FIRST

Our spaces have been engineered to have minimum impact on the environment – and on your running costs, too. Natural finishes, tactile timber and beautiful living-plant walls in the reception area bring the feel of the pastoral outdoors, indoors.

PUTTING THE PLANET FIRST

PUTTING THE PLANET FIRST

Our spaces have been engineered to have minimum impact on the environment – and on your running costs, too. Natural finishes, tactile timber and beautiful living-plant walls in the reception area bring the feel of the pastoral outdoors, indoors.

  • Fusion 3 has attained an EPC grade B and Fusion 1 will achieve an EPC of B following refurbishment
  • The majority of buildings within the park are EPC grade D, or EPC grade C at best
  • The electricity supply comes entirely from renewable sources
  • Heat-recovery technology
  • Automated light-dimming systems
  • 4 Electric car charging points
  • Free use of Fusion bicycles
  • Zero waste to landfill policy

THE NITTY GRITTY

  • Suspended ceilings with recessed, daylight-dimming lighting and PIR sensors
  • Enhanced and optimised four-pipe VRF heating and cooling system
  • Inverter technology heat-recovery ventilation, providing up to 81.5% efficiency
  • Raised access floors
  • Shower facilities
  • Dedicated 11,000V power supply exclusively for the tenants services
  • 13 person/1000kg capacity lifts
  • Bicycle facilities
  • Extensive allocated parking with parking enforcement
  • Refurbished reception areas
  • 24/7 Security
  • HDPT2 Infrared security cameras
  • Paxton video access controls